/ Trade specifications

Material schedules & dispatch

Direct access to calibrated material take-offs, custom tile cuts, and physical sample swatches prepared within 24 hours for verified commercial and residential build schedules.

Direct dispatch

Leave Your Message...

Provide architectural schedules, required square meterage, or finish specifications. Our logistics team returns confirmed crate weights and freight quotes within one business day.

Logistics protocol

Inspection & delivery standards

Clear handling criteria for palletized transit, crate inspection, and project continuity.

Transit
Verification
Continuity

Palletized transit

48-hour inspection

10-day batch hold

Consignments travel on banded, shrink-wrapped timber pallets with shockwatch tilt indicators to verify structural integrity upon arrival.

Report crate damage or calibration variance within 48 hours of site drop. Replacements pull immediately from reserved backup stock.

Unopened full cartons may be returned within 10 days. Matching production dye lots remain reserved during ongoing installations.